PHYSICAL RECEIVING LOG — OCTOBER 28, 2026 Recorder: Morgan Chen, Receiving Inspector Measurements and observations below were recorded at goods receipt. No QA release decision has been made. Rows are ordered by unloading sequence, not purchase order sequence. Line ID: RM-404 PO line: 40 Heat / Lot ID: HT-94D Supplier batch: SB-904 Quantity received: 8 Unit: bars Visual condition: No visible damage Inspection note: Heat stamp verified Line ID: RM-401 PO line: 10 Heat / Lot ID: HT-61A Supplier batch: SB-901 Quantity received: 24 Unit: m Visual condition: No visible damage Inspection note: Received with legible heat marking Line ID: RM-407 PO line: 70 Heat / Lot ID: HT-37G Supplier batch: SB-907 Quantity received: 14 Unit: pcs Visual condition: No visible damage Inspection note: Batch markings match delivery Line ID: RM-402 PO line: 20 Heat / Lot ID: HT-72B Supplier batch: SB-902 Quantity received: 12 Unit: pcs Visual condition: Minor edge scuff Inspection note: Scuff on protective outer edge; QA review required Line ID: RM-408 PO line: 80 Heat / Lot ID: HT-48H Supplier batch: SB-908 Quantity received: 5 Unit: bars Visual condition: No visible damage Inspection note: Certificate not included in shipment; document hold Line ID: RM-405 PO line: 50 Heat / Lot ID: HT-15E Supplier batch: SB-905 Quantity received: 10 Unit: sheets Visual condition: Packaging torn Inspection note: Metal surface not visibly damaged; verify protective wrapping Line ID: RM-403 PO line: 30 Heat / Lot ID: HT-83C Supplier batch: SB-903 Quantity received: 6 Unit: sheets Visual condition: No visible damage Inspection note: Material label intact Line ID: RM-406 PO line: 60 Heat / Lot ID: HT-26F Supplier batch: SB-906 Quantity received: 18 Unit: pcs Visual condition: Surface oxidation Inspection note: Light oxidation observed; QA evaluation pending