NORTHLINE FABRICATION — JOB TRAVELER Work order: MF-7824 Customer: Ridgeway Equipment Contractor: Northline Fabrication Inspection date: 2026-10-28 Inspector: M. Chen Drawing / revision: DWG-FP-440 / Rev C Measurement unit: mm Inspection method: Caliper and micrometer dimensional verification Parts on inspection traveler: Part ID: FP-101 | Lot ID: LOT-26A Part ID: FP-102 | Lot ID: LOT-26A Part ID: FP-103 | Lot ID: LOT-26B The traveler establishes identity and routing only. It does not establish quality disposition or sign-off.