TT-213 | FIELD VISIT RECORDS | ORIGINAL ISSUE A Work order: WO-213-047 Client: East Ridge Utilities Site: Compressor Hall Inspection date: 2026-11-03 Procedure: VIB-213 Rev 2 Inspector: A. Mercer Visit ID | Equipment ID | Inspection point | Visit | Observed time | Method | Reading (mm/s) | Limit (mm/s) | Evidence reference | Remarks VIS-213-01 | CMP-410 | Drive-end bearing | Morning | 07:35 | Vibration | 3.2 | 4.5 | FN-213-01 | Baseline VIS-213-02 | CMP-410 | Drive-end bearing | Afternoon | 13:20 | Vibration | 4.1 | 4.5 | FN-213-02 | Same point, later visit VIS-213-03 | CMP-410 | Non-drive bearing | Morning | 07:49 | Vibration | 2.8 | 4.5 | FN-213-03 | Separate bearing VIS-213-04 | PMP-220 | Inboard bearing | Morning | 08:05 | Vibration | 4.9 | 5.0 | FN-213-04 | Near limit VIS-213-05 | PMP-220 | Inboard bearing | Afternoon | 13:42 | Vibration | 4.7 | 5.0 | FN-213-05 | Independent logger disagrees VIS-213-06 | PMP-220 | Outboard bearing | Morning | 08:18 | Vibration | 5.3 | 5.0 | FN-213-06 | Above limit VIS-213-07 | FAN-118 | Motor bearing | Morning | 08:50 | Vibration | 3.6 | 4.0 | FN-213-07 | Reference inspection VIS-213-08 | FAN-118 | Motor bearing | Afternoon | 14:03 | Vibration | 6.4 | 4.0 | FN-213-08 | Corrected by signed amendment VIS-213-09 | FAN-118 | Fan bearing | Morning | 09:00 | Vibration | 3.1 | 4.0 | FN-213-09 | Different point VIS-213-10 | BLW-307 | Coupling | Morning | 09:27 | Vibration | 2.1 | 3.0 | FN-213-10 | Baseline VIS-213-11 | BLW-307 | Coupling | Afternoon | 14:28 | Vibration | 3.4 | 3.0 | FN-213-11 | Later visit exceeds VIS-213-12 | BLW-307 | Drive bearing | Afternoon | 14:37 | Vibration | 2.7 | 3.0 | FN-213-12 | Separate point Evidence responsibility: Original Issue A contains technician observations; the signed amendment is the only authorized revision for VIS-213-08. The same equipment and point appears on different visits; time/visit are essential for row ownership. Reviewer: NOT SIGNED Release authorization: NOT ISSUED